Question1: What defines lease rate factor (LRF)?
Question2: An architect is planning an HPE Integrity Superdome X solution with the following nPartitions:nPar 1= Slots 1, 3, and 5nPar 2 = Slots 2, 4, and 6The Superdome X solution must connect to a Fibre Channel SAN solution, which provides boot disks for the Superdome X solution.The architect has selected a FlexibleLOM adapter for each blade.What is a valid plan for additional adapters?
Question3: Which discussion point describes a Tier I approach to datacenter redundancy levels?
Question4: A software development customer's data center has servers from three different vendors. The customer plans to purchase 15 HPE c7000 enclosures that are populated with BL460c Gen9 blades. Each enclosure will be deployed with HPE OneView advanced licensing. The customer uses third-party SNMP-based management tools as well as some customdashboards that were written to monitor the statue of the datacenter.The infrastructure management team is concerned about how to integrate HPE OneView into its management strategy.What should the architect demonstrate?
Question5: An architect is planning an HPE Moonshot System to host a customer Hadoop MapReduce2 application.The architect originally proposed the following:m710 cartridgesHPE 45XGc switchesHPE 4-QSFP+ Uplink ModulesThe customer now needs each HPE Moonshot chassis to provide at least 1TB of memory and 40TB or local storage.Cartridge nodes needs two 10GbE ports each.What does the architect need to replace in the solution to meet the customer's new requirements?
Question6: A customer has HPE BladeSystem BL460c Gen9 blades with two processors and 512GB of memory. The blades are running a MS-SQL database on a clustered 2TB SAS virtual volume that is exported from an HPE 3PAR StoreServ 8200. The customer reports that the MS-SQL database is performing poorly.After extensive performance trending analysis, it is determined that the database front-end I/O requirements are unpredictable and often exceed 100,000 IOPs with latency in excess 30ms at critical times.Which solution should the architect recommend to resolve the performance issue with consideration to cost and complexity?
Question7: An architect reviews an HPE Apollo 6000 design and finds that there are plans for redundant iLO connections on each HPE Apollo 6000 chassis to a pair of top-of-rack switches. These switches are set up as individual switches connected to a single core.Which configuration change should the architect recommend to ensure a loop free management topology?
Question8: A customer is deploying HPE Apollo Systems, which the customer hopes will help the organization achieve its goals for efficient energy operations. In assessing the customer maturity, the architect finds that IT staff has limited insight into how efficiently servers are operating and limited ability to enforce energy efficiency policies.Which solution should the architect recommend to help solve these issues?
Question9: A customer requests a proposal for an HPE Apollo 4530 system. The customer reports that it has experienced problems in the past with boot time malware attacks within its environment.Which solution should the architect propose to protect the customer from this threat?
Question10: What is a basic assumption for an architect using the HPE Servers TCO calculator to justify a customer's migration away from a fully depreciated set of hardware?
Question11: An architect finds several vulnerabilities with a customer's digital enterprise that could lead to data loss on a third-party storage system for critical business segments.Which solution should the architect propose to help the customer to protect their digital enterprise?
Question12: A customer is planning to migrate from a Virtual Connect Enterprise Manager (VCEM) environment to HPE OneView.Which topic should the architect discuss with the customer before the migration is implemented?
Question13: An architect proposes an HPE Moonshot server solution for a customer. The customer needs a single processor solution with a network switch to allow 10Gb connectivity and support for a software-defined network solution.Which HPE Moonshot switch module meets the customer's needs?
Question14: An architect is proposing a solution that has two HPE Moonshot 1500 chassis, each of which is full of m700 cartridges. The customer needs the solution to quickly deploy the OS to cartridges, back up a golden node image. and clone the image.The customer is concerned about cost and is not interested in managing or monitoring performance of the solution,Which solution meets these requirements?
Question15: A customer's Gen9 web server resides behind a firewall.What is the most secure and efficient method to monitor this server?
Question16: An architect needs to demonstrate the financial advantages of a proposed HPE server and Hypervisor- based solution compared to a legacy server environment that has traditional servers and desktops.Which tool should the architect use?
Question17: A customer has 1,000 virtual machines that run on VMware ESXI servers. The customer is concerned that some of the virtual machines may be oversized, which could affect the other virtual machines.Which HPE product should the architect recommend to help the customer with infrastructure sizing, to improve efficiency, and to reduce cost?
Question18: A customer plans to purchase some c7000 blade enclosures equipped with Virtual Connect FlexFabric modules to support its development and test team. The customer is concerned about frequent changes to the server blade connectivity. In the initial proposal, an architect included HPE OneView, and now the customer wants to learn how HPE OneView will address their concern.Which HPE OneView functionality should the architect explain to the customer?
Question19: A customer has a large Oracle-based ERP solution that runs on HPUX and multiple rx2800 i2 servers. The customer plans to move to an open source solution to reduce operating expenses. The customer needs the ability to deliver incremental capacity and needs to avoid incremental Oracle licensing costs.Which HPE Server solution will help meet the customer's needs?
Question20: A customer needs a live transcoding solution that meets the following requirements:Supports thousands of HD streamsProvides GPU accelerationProvides a high density of streams per Watt and rack unitWhich solution should the architect recommend?
Question21: When designing a Superdome X configuration for a customer, which storage configuration should the architect choose?
Question22: A customer needs a hosted physical desktop solution. Users will run typical oꢀice applications with limited use of some media-rich applications such as Adobe Photoshop. The customer needs the densest and most cost-effective solution that can support such users.Which HPE Moonshot cartridge should the architect recommend?
Question23: An architect is planning an HPE Moonshot solution with m710p cartridges. The customer's application requires cartridge nodes to connect to a NAS. The customer's current infrastructure supports 10GbE. In the future, the customer plans to upgrade the fabric between the HPE Moonshot and the NAS solution to support 40GbE.Which switch modules and uplink modules should the architect recommend to meet both the current and future needs?
Question24: An architect needs to design a solution for a customer that stores all data on third-party NAS storage, and that does not yet have a database solution. The new HPE-based solution must be optimized for data mining.How can the current data stored on the NAS be used for data mining?
Question25: A customer has an HPE Integrity Superdome X system with an nPartition that has been provisioned with a supported OS and application.What first detects data corruption caused by an installed DIMM module?
Question26: A customer has a mixed environment based on the G6, G7, Gen8, and Gen9 ProLiant server blades. The customer is interested in implementing HPE OneView but needs to understand security and monitoring mechanisms for different server generations.Which statement most accurately describes different platform support in HPE OneView?
Question27: An architect is determining the amount of memory to propose for an HPE XL230a compute tray.The customer specifies several requirements, properties, and parameter of the application.Which factor will critically affect the memory amount requirement to prevent a potential memory bottleneck?
Question28: Which of the HPE Transformation Areas should the architect discuss when the customer's concerns span backup and recovery, high availability, and disaster recovery?
Question29: Which factors must the architect consider to help define an appropriate HPE server solution to meet a customer's needs?
Question30: An architect is designing an HPE Apollo 6000 solution to support a customer application. The architect is choosing between the HPE ProLiant XL230a and the XL250a compute tray.What is one reason for choosing the XL250a tray?
Question31: An architect is choosing between 1GbE and 10GbE connectivity for an object storage solution.What is a valid reason to select 10GbE?
Question32: An architect plans to propose a solution and illustrate how it will reduce the predictable and repeatable costs for items and services not registered as assets.Which reporting period information helps the architect achieve this goal?
Question33: A customer needs to streamline monitoring to its HPE Apollo 6000 solution.Which benefit can HPE Advanced Power Management (APM) provide to this customer?
Question34: A customer needs an HPE Apollo 6000 solution and Remote Direct Memory Access (RDMA).Which network interconnects should the architect recommend for this solution? (Choose two.)
Question35: An architect is writing a response to a Request for Proposal (RFP). The customer has requested financial information on the monetary amount by which assets are valued in business records.Which value does the architect need to consider?
Question36: A customer has an HPE Integrity Superdome X solution. The customer requires flexible nPartitions that IT staff can quickly build at different times based on a pre-defined template.Which approach should the architect recommend the customer take to meet this requirement?
Question37: An architect is designing a data center solution that contains an HPE BladeSystem for the virtual application, infrastructure, and VDI environment. It also contains an HPE Moonshot for the web servers.In which parts of the HPE Transformation Area does this solution fit?
Question38: An architect is proposing an HPE Moonshot System, including m710 cartridges, an iLO Chassis Manager, switch, and uplink modules. The customer needs IT staff to be able to access cartridges over a Remote console.What should the architect explain to the customer?
Question39: A customer needs high performance computing (HPC) and a small-scale solution with up to eight processors. The solution should also provide storage in a modular form factor. The customer's HPC application is designed so that some nodes act as compute nodes while others act as storage nodes that serve data to the compute nodes.Which HPE Apollo system is most appropriate for this situation?
Question40: An architect has selected the FlexibleLOM option fur HPE XL230a compute trays, which will host an HPC application.When should the architect select a FlexibleLOM adapter that supports Fibre Channel over Ethernet (FCoE)?